The project will deliver a single footprint, 16 bed, ITU on B36 by expanding into B41 (Philip Yeoman). The ITU will be reconfigured to meet the needs of the service in terms of clinical and non-clinical space.
There is a need to remove redundant CP Electronics lighting module systems and install conventional lighting control systems in the pathology building.
the supply and installation of a pathology lighting control system
The Trust have identified the need to install heating supply system will be supplying the PGMC building through its peak heating loads. The solution will have to consider the limited space and new piping areas between the buildings containing the asbestos.
The Trust have identified the need to install heating supply system will be supplying the PGMC building through its peak heating loads. The solution will have to consider the limited space and new piping areas between the buildings containing the asbestos.