for the provision of the replacement of one Cama platform lift, electric 225kg, located within the Lecture Theatre of the National Maritime Museum, to the technical specification outlined within the Specification and General Contact Details.
This notice is to collect interested parties for RFQ submission only. Please contact B Hodges to request further information.
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
The museum's Engagement Department has education and learning spaces used by visiting schools and other groups at various locations. This contract is for the refurbishment of the central Group Space at the main museum site.
The Group Space is a single room, approximately 90m2.
The contract to be awarded is for the refurbishment of the central Group Space at the National Maritime Museum, Greenwich. The provisional scope of the work, subject to change, is to:
•remove built in bench seating at the perimeter, making good to walls
•install new 3 compartment skirting or dado trunking to two walls
•re-provide power outlets and data points from under bench seats into new trunking
•provide new LED lighting panels flush within suspended ceiling
•renew suspended ceiling tiles, including re-instating all M&E fittings aside from new lighting
•apply window privacy film
•repair or renew store cupboard door locks and hinges
•carry out interior redecorations
•renew vinyl flooring
For guidance purposes, the indicative budget is circa £30,000 excluding VAT.
Works duration 2 weeks
Commencing February Half Term 2023
Start 13th February 2023
Must complete 24th Feb 2023.
It is anticipated that the contract would be let on an NEC4 Engineering and Construction Short Contract (ECSC).
The contract would be subject to CDM Regulations. The appointed contractor would need to fulfil the duties of Main Contractor. This would include coordination and liaison with the clients directly employed specialists for certain distinct systems such as fire alarms, access and intercoms.
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
A new Briefing Space will be created in the Re-Think area of Sammy Ofer Wing, by its division using mobile room dividers to create a flexible space for school groups, activities, and events. A duplicate of an existing magnetic wall display will enhance the area. The dividers and display to be provided are detailed in the attached documents. Please see the attached design.
Upgrade of Trend BMS at Royal Museums Greenwich Including:
- IQ3 Controller Upgrade
- BMS Head End Upgrade Works
- Survey & Validation Works
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
consultancy project management service to support the delivery of a number of Estates Capital Projects, from cradle to grave, as and when required, for a period of three years.
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Portions of the wider RMG collection when not on display are managed and conserved at the Prince Philip Maritime Collection Centre (PPMCC) in Kidbrooke. The site comprises conservation studios and various modes of storage which vary between museum-grade ‘conservation’ conditioned spaces, standard grade ‘domestic’ conditioned spaces, ‘background’ conditioned spaces, unconditioned weatherproof stores, and exterior storage areas.
The A-Spur and C-Spur buildings are single storey pre-war brick ‘H-Plan’ buildings comprising several wings or ‘Spurs’. The Spurs have flat roof coverings approaching end of life. The roof coverings require overcovering including renewal of fasciae and rainwater goods. Due to funding constraints and a risk averse approach to the stored collection, RMG cannot fully strip and replace the roofs.
This opportunity is for construction works at Prince Philip Maritime Collections Centre, for Spur Roof Overlays, as detailed in Schedule 5 – Schedule of Works and Specification
Further information relating to this is within the tender documents
For more information about this opportunity, please visit the Delta eSourcing portal at:
https://www.delta-esourcing.com/tenders/UK-UK-London:-Roof-works-and-other-special-trade-construction-works./H7XUQ67R45
To respond to this opportunity, please click here:
https://www.delta-esourcing.com/respond/H7XUQ67R45