The works include the re-cladding, re-roofing and refurbishment of an existing aircraft hangar currently in use as a museum gallery, a new build Collections Hub with a link to an existing conservation centre and creation of a number of internal rooms within the Collections Hub and Site wide landscaping works will include the development of a new public realm
The works include the re-cladding, re-roofing and refurbishment of an existing aircraft hangar currently in use as a museum gallery, a new build Collections Hub with a link to an existing conservation centre and creation of a number of internal rooms within the Collections Hub and Site wide landscaping works will include the development of a new public realm
The consultant will oversee provide monitoring and reporting services during RIBA stages 4-6 in support of the development and delivery of the programme of capital works (specifically Hangar 1, the Learning Centre and new exhibition spaces, the landscaping and public realm and the services interface integrating with the Collection Hub building but not including the design of that building) at the RAF Museum Midlands, Cosford Site. (The Museum uses
Prince2TM project management standards and systems).
The service broadly comprises:
• Overseeing/ reporting on Contractors design proposals
• Ongoing attendance/ reporting to monitor installation quality and
workmanship
• Undertake witness testing/ snagging/ reporting of MEP systems on
behalf of client.
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
For a copy of all tender documentation please contact the Procurement Officer directly via e-mail . Details are: tom.birch@greenwoodprojects.com and/or call on 01543 414777