To carry out annual play equipment inspections of our 3 sites
Parkers Field Toddler area, North Petherton, TA6 6PN
Parkers Field Teenage area TA6 6PN
Memorial Park, North Petherton TA6 6SN
A list of equipment on each site is attached.
To provide a comprehensive report of each piece of equipment.
The contractors will carry out an annual inspection 24/25, 25/26, 26/27.
SPECIFICATION
To carry out cleaning of 13 bus shelters as listed below on a quarterly basis.
Kerland (north bound and sound bound)
Compass (north bound and sound bound)
Huntworth Lane (Jct24 near the motorway)
Newton Lane (north bound and sound bound)
Baymead Lane (north bound and sound bound)
Shovel Lane (north bound and sound bound)
Fore Street (north bound and sound bound)
To carry out 4 cleans in 24/25 and 25/26.
To apply
Document can be downloaded from https://northpethertontowncouncil.gov.uk
or by emailing amanda.young@northpethertontowncouncil.gov.uk
Application is to be made on the specific quotation form which is provided with this notice or can be downloaded from the Town Council's website.
The Cemetery has 2 areas for the interment of cremated remains, known as the Garden of Rest / Remembrance, these are currently delineated by box hedging approx. 80cms high.
During the past year the box has been affected by box moth with most of the leaves and green shoots being eaten by the caterpillars.
The Town Council has decided that the box hedging should be replaced by yew or ilex or a mixture of both.
The drawings included with this document give an indication of the approximate lengths of hedging (please note they are indicative only and are not to scale) but it is strongly suggested that before submitting a quotation contractors should verify the relevant lengths of hedging to ensure they quote for a suitable number of plants. (The cemetery is not locked and the 2 Garden of Rest areas are easily found just inside the gates).
The Town Council will try to avoid booking any interments in the Garden of Rest whilst the contractor is scheduled to be on site, however if, for any reason, an interment does need to be scheduled the contractor will be informed and will cease work for the duration of the interment (normally 30mins -1hour)
There is water and electricity in the nearby chapel building but any hoses or extension leads would need to be brought to site by the contractor.
The submitted quotation should include pricing for:
• Digging-out, removal and disposal of the existing box hedges
• Preparing the ground for planting new hedging
• Supply (and delivery) of the new plants
• Planting of the new plants
• Return to site every 3 months for a 1 year period from the planting date to check on health of plants and replace any that are failing to thrive
• Providing care instructions for the new plants
It would be helpful if contractors also indicated separately to the quotation document if they would be prepared to attend site and water the new plants as and when required and gave a price for doing so.
NPPCT are seeking quotes for quarterly operational playground inspections for both Parkersfield TA6 6PN and Memorial Park TA6 6SN, initially on a 1-year contract.
• Inspections every 3 months of both sites
• To be carried out by a person(s) holding a minimum RPii operational inspector qualification
• Inspections to include tightening, lubricating, adjusting loose items, replacing any screw covers etc. removing graffiti
• Removing litter, weeds etc. from under the trampolines
• Inspection of fencing, paths, grounds(general)
• Provide a full detailed report with photos.
you can apply via North Petherton Town council Website or emailing enquiries@northpethertontowncouncil.gov.uk