The appointed Exhibition Fit Out Contractor is expected to progress the exhibition designs for the permanent exhibition space on the Ground Floor and Temporary Exhibition Space on the First Floor and circulation spaces within these up to RIBA Stage 4 design and build the exhibition spaces up to RIBA 7 for opening which is anticipated for June 2026.
Done under Open Procedure.
National Museum of the Royal NavySouth EastWAC-440327
The NMRN is seeking a fabrication contractor to design, fabricate and install a lamination jig for the production of large dimension timber elements for use in the conservation of HMS Victory's hull.
The aim of the HMS Victory Conservation Programme is to deliver a fully conserved ship, able to survive in an open environment for the next 50 years without major work beyond a programme of planned maintenance.
National Museum of the Royal NavySouth EastWAC-489539
The NMRN are seeking to appoint a contractor to undertake caulking works to the upper deck of HMS Trincomalee in specific areas. The NMRN has already undertaken caulking work with our own dedicated shipwrights team, however, there is a requirement to appoint a contractor to undertake further caulking work to support them.
National Museum of the Royal NavySouth EastWAC-489545
The National Museum of the Royal Navy (NMRN) are seeking to appoint a supplier or suppliers for the provision of IT Hardware to support the purchase of infrastructure hardware and software solutions to rebuild and upgrade the NMRN's IT Infrastructure.
This procurement has been split into multiple lots, representing the individual hardware requirements- these can be found in the ITT document. Suppliers are able to bid on as many, or as few lots as they wish.
National Museum of the Royal NavySouth EastWAC-559248
The National Museum of the Royal Navy (NMRN) advertised this tender opportunity to appoint a contractor for the works to replace the existing planking on the Waterbus Jetty at the Royal Navy Submarine Museum, Gosport and carry out repairs as necessary.
The Jetty is one of the primary entrances to the Submarine Museum and sees a large number of visitors pass across it throughout the year. The tender was undertaken as a Competitive Flexible procedure.
National Museum of the Royal NavySouth EastWAC-530872
The National Museum of the Royal Navy (NMRN) has reviewed its current cyber security stack and is looking to implement further measures to protect its systems, data and people. Solutions to be implemented should complement current security measures and enhance our visibility, understanding and response to cyber threats within the IT environment.
The NMRN is reviewing its supply arrangements to ensure that it is aware of what the market currently has to offer and is in a position to select a supplier that is best able to deliver the National Museum's requirements over the next 3 - 5 years.
The tender is split into three lots, which were able to be awarded either as a whole, multiples or as single awards upon evaluation.
National Museum of the Royal NavySouth EastWAC-530874
The NMRN is seeking a fabrication contractor to design, fabricate and install a lamination jig for the production of large dimension timber elements for use in the conservation of HMS Victory's hull.
The aim of the HMS Victory Conservation Programme is to deliver a fully conserved ship, able to survive in an open environment for the next 50 years without major work beyond a programme of planned maintenance.
National Museum of the Royal NavySouth EastWAC-465639