Shipment of materials thay may be valuable and temperature sensitive and require priority courier services that provide enhanced levels of shipment visibility and operational interventions. This is particularly true for dry ice and gel pack shipments, which require assurance and maintenance of cold chain throughout whole transit even if there are transport or customs delays.
This requirement is to provide a replacement purified water system to support the MHRA production facility at our South Mimms site (EN6 3QG). This includes removal and disposal of the current system and installation, commissioning, training and validation of a new purified water system to provide a consistent supply of purified water to USP 24.
To provide a new and improved waste disposal system, it is anticipated that the downflow booth and vacuum pipework will be retained so any new system must be compatible with both.<br/>The successful supplier must have installed their proposed system on multiple sites with a proven record of service and supply details on request. The supplier will design and deliver all aspects of the installation, including waste removal/recycling of old equipment in the most environmentally friendly way, waste certificates will be required
The Medicines and Healthcare products Regulatory Agency requires a UK Approved Body that is capable of certifying IVD devices produced by Scientific Research and Innovation that are placed on the GB market.
Shipment of materials thay may be valuable and temperature sensitive and require priority courier services that provide enhanced levels of shipment visibility and operational interventions. This is particularly true for dry ice and gel pack shipments, which require assurance and maintenance of cold chain throughout whole transit even if there are transport or customs delays.