1. Existing play area needs to be dismantled, along with the playground surfacing, and disposed of. This area then needs to be top soiled and seeded to re-instate the site to the natural surroundings (pre-park condition).
2. New location has been identified for the redevelopment of the site, and a new inclusive and educational designed playground for ages 4-14 required.