Carbon Net Zero - Gas Cooker Replacements at Various
Premises Across the LFB Estate - Phase 2 - Tender A
The London Fire Commissioner has committed to a the GLA's 2030 Carbon Net Zero Targets. As part of these efforts to eliminate sources of carbon emissions, we are replacing gas cooking equipment at our stations and replacing with new electric cookware.
This is one of two tender opportunities at various sites across our wide estate, and the London Fire Commissioner invites suppliers to bid for either or both opportunities on a 100% cost basis. This opportunity consists of 12 sites where cookware replacements are required and will be referred to as 'Tender A'. Suppliers are reminded to ensure that if hoping to tender for both opportunities, that they submit all necessary tender submission documents required to the respective Adamprocure requirement, to ensure a successful tender for both opportunities.
The 12 sites concerned on this opportunity are as follows:
(1) ADDINGTON
(2) BECKENHAM
(3) BEXLEY
(4) BROMLEY
(5) DEPTFORD
(6) EAST GREENWICH
(7) FOREST HILL
(8) LEE GREEN
(9) PECKHAM
(10) SHOREDITCH
(11) SOHO
(12) WEST NORWOOD
Within the attached tender package, please find enclosed tender documents, reading from 'Instructions to Tenderers' onwards into appendices and works schedules. As per the ITT document, tenderers will be required to submit the following information:
(a) A completed pricing schedule. See Works Schedule No. 3 - Pricing Schedule.
(b) A completed form of tender.
(c) CVs of the Tenderer's key personnel.
(d) Details of any work proposed to be sub-contracted together with the names and
experience of the sub-contractors proposed.
(e) Copies of registration certificates to trade organisations e.g. Gas Safe and NICEIC (see
clause A33/450 of Work Schedule No 1 - the Preliminaries).
(f) A copy of the Tenderer's Equal Opportunities policy (see Appendix C II - Equalities
Protocol
An Excel pricing schedule has been provided for convenience. Please ensure that this is completed and returned in excel format for ease price-checking. Please ensure that provisional sums / contingencies as required by he employer are included within the final sum and form of tender.
Please note that the project start and end dates are indicative only and are expected to be subject to lead times for deliveries of new cookware equipment. It is expected that a successful tenderer will complete the works in a timely manner in accordance with an agreed project delivery programme and timescales.
Please direct any clarifications via the messaging function on this requirement and requests for site visits to george.gray@london-fire.gov.uk
This opportunity has been distributed on adamprocure.co.uk
General Construction Multi Trade - GCMT - Commercial (20% VAT)
The refurbishment of the front appliance bay doors, replacement of the rear appliance bay doors with roller shutter doors. The replacement of the dummy doors at the front of the station which act as curtain walling to the accommodation behind, offices, meeting rooms, dorms etc This opportunity has been distributed on adamprocure.co.uk
General Construction Multi Trade - GCMT - Commercial (20% VAT)
JCT contract for remedial works to building cracking / subsiding due to clay soil shrinkage. Demolition of existing masonry external stairwell enclosure and concrete staircase; groundworks to repair drainage and reinstate gas supply; forming of new raft foundation to stabilise movement; supply and install of new pre-fabricated external staircase and access ladder; replacement of glazing This opportunity has been distributed on adamprocure.co.uk
Upgrading the existing electrical services within Lee Green Fire station including new wiring, lighting, small power and fire alarm throughout. This opportunity has been distributed on adamprocure.co.uk
Principal Contractor - Principal contractor - Commercial (20% VAT)
JCT works contract for refurbishment / remodelling of a London Fire Brigade training venue at Tottenham Fire Station This opportunity has been distributed on adamprocure.co.uk
Principal Contractor - Principal contractor - Commercial (20% VAT)
Provision of replacement appliance bay doors and associated controllers at East Ham and Enfield fire stations.
This opportunity has been distributed on adamprocure.co.uk
Principal Contractor - Principal contractor - Commercial (20% VAT)
Provision of replacement appliance bay doors and associated controllers at East Ham and Enfield fire stations. This opportunity has been distributed on adamprocure.co.uk
The Provision of Design and Build for Decarbonisation: Erith, Greenwich and Stanmore Fire Stations
The works involve replacing gas heating systems with air-source heat pumps, installing solar panels, and improving lighting efficiency. Coordinating new electrical mains with the DNO. Civil works such as trenching for services are also included.
LFB fire stations are being upgraded to include gender neutral facilities to all stations. Works to include strip out of existing dormitories and changing / washing facilities and installation of new, along with all temporary works and main contractor’s duties in a fully operational environment
The Provision of Design and Build for Decarbonisation: Stoke Newington, Tottenham and Willesden Fire Stations
The works involve replacing gas heating systems with air-source heat pumps, installing solar panels, and improving lighting efficiency. Coordinating new electrical mains with the DNO. Civil works such as trenching for services are also included.
Replacement of the existing generators with new fully automatic mains failure generators to provide backup power to the mechanical and electrical services at five fire stations: Beckenham, Bromley, Kingston, Wandsworth and Woodford.
LFB fire stations are being upgraded to include gender neutral facilities to all stations. Works to include strip out of existing dormitories and changing / washing facilities and installation of new, along with all temporary works and main contractor’s duties in a fully operational environment