The design, supply, and installation of modifications to our existing Natural Gas Roller Hearth Tile Kiln. Our organisation intends to transition the kiln to operate on 100% hydrogen, whist retaining the existing natural gas combustion system and ensuring its safe and efficient operation. The kiln therefore requires the parallel installation of 100% hydrogen rated burners.
The installation and commissioning of five Hygrothermal Chambers designed for exposure testing of large samples, adhering to a number of European Approval Documents (EADs) to include EAD 040083, EAD 090062, EAD 040287, EAD 040427 along with Moat 22, and BS EN 16383 standards.
The design, construction, installation and commissioning of a bespoke designed dual fuel furnace with specific adaptions for enhanced data collection to facilitate the modelling of furnace temperature distributions during operation and to monitor changes to the product in the furnace during the heating and cooling cycles.
The design, supply, and installation of modifications to our existing Intermittent blended Natural Gas / Hydrogen Kiln. Our organisation intends to transition the kiln to fire on 100% hydrogen and a range of hydrogen and natural gas mixes while ensuring its safe and efficient operation.