Building Clerk of Works for the construction of a new data centre and energy centre building at the John Innes Centre, for and on behalf of Norwich Bioscience Institutes.
This package of works forms part of the Next Generation Infrastructure (NGI) Programme, a funded development programme looking to develop the facilities across Norwich Research Park to transform the existing capabilities of John Innes Centre (JIC) and The Sainsbury Laboratory (TSL), both internally recognised centres of excellence in plant and microbial science. NGI will address the deterioration of infrastructure at JIC and TSL to create a world-class facility that will engage with its surroundings, is outward looking and promotes collaboration and innovation to supercharge JIC and TSL's ability to translate scientific knowledge into practical solutions.
This package of works comprises of the demolition of existing buildings, provision of upgraded internal access roads and below ground infrastructure works including (but not limited to) new and relocated communications and electricity cabling, upgraded mains water infrastructure, new surface water drainage and new district heating pipework to enable site wide development proposals at John Innes Centre and NGI (the Works).
The Works will be carried out on a live scientific research site and in close proximity to ongoing operations and adjacent healthcare facilities. The Works have been designed by the NGI client-side design team who were procured through a competitive tender process in 2018/2019.
The intention is for the Works to be governed by the JCT Standard Building Contract Without Quantities 2016 with JIC amendments.
This package of works forms part of the Next Generation Infrastructure (NGI) Programme, a funded development programme looking to develop the facilities across Norwich Research Park to transform the existing capabilities of John Innes Centre (JIC) and The Sainsbury Laboratory (TSL), both internally recognised centres of excellence in plant and microbial science. NGI will address the deterioration of infrastructure at JIC and TSL to create a world-class facility that will engage with its surroundings, is outward looking and promotes collaboration and innovation to supercharge JIC and TSL's ability to translate scientific knowledge into practical solutions.
This package of works comprises of the demolition of existing buildings, provision of upgraded internal access roads and below ground infrastructure works including (but not limited to) new and relocated communications and electricity cabling, upgraded mains water infrastructure, new surface water drainage and new district heating pipework to enable site wide development proposals at John Innes Centre and NGI (the Works).
The Works will be carried out on a live scientific research site and in close proximity to ongoing operations and adjacent healthcare facilities. The Works have been designed by the NGI client-side design team who were procured through a competitive tender process in 2018/2019.
This package of works forms part of the Next Generation Infrastructure (NGI) Programme, a funded development programme looking to develop the facilities across Norwich Research Park to transform the existing capabilities of John Innes Centre (JIC) and The Sainsbury Laboratory (TSL), both internally recognised centres of excellence in plant and microbial science. NGI will address the deterioration of infrastructure at JIC and TSL to create a world-class facility that will engage with its surroundings, is outward looking and promotes collaboration and innovation to supercharge JIC and TSL's ability to translate scientific knowledge into practical solutions.
This package of works comprises of the demolition of existing buildings, provision of upgraded internal access roads and below ground infrastructure works including (but not limited to) new and relocated communications and electricity cabling, upgraded mains water infrastructure, new surface water drainage and new district heating pipework to enable site wide development proposals at John Innes Centre and NGI (the Works).
The Works will be carried out on a live scientific research site and in close proximity to ongoing operations and adjacent healthcare facilities. The Works have been designed by the NGI client-side design team who were procured through a competitive tender process in 2018/2019.
The Works are governed by the JCT Standard Building Contract (Without Quantities) 2016 with client amendments.
This package of works form part of the Next Generation Infrastructure (NGI) Programme, a funded development programme looking to develop the facilities across Norwich Research Park to transform the existing capabilities of John Innes Centre (JIC) and The Sainsbury Laboratory (TSL), both internationally recognised centres of excellence in plant and microbial science.
This package of works relates to the of pre-construction services in connection with the design and build of a new High Performance Computing Data Centre and Energy Centre (the Project). The scope of works include:
(a) Development of a RIBA Stage 4 design.
(b) Proposal for a contract sum to construct the Project based on the RIBA Stage 4 design.
(c) Development of a construction methodology and programme to construct the Project.
(d) Enabling works to create site access and compound ahead of construction of the Project.