Procurement exercise for Water Booster Set Replacement
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=1004899390
Procurement exercise for the provision of Generator Hire
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=992743421
HMP The Verne have a requirement within the Main Boiler House to install a new inline mechanical filtration system with heat exchangers to the existing district main heating circuit and replace the (X4) existing main boilers.
Procurement exercise for Asbestos Removal
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=986420412
Procurement exercise for PIDS System upgrades.
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=1008361078
A feasibility study will be conducted to evaluate the current condition and functionality of the following facilities:
Workshop 1 at London Fashion College
The Main Store and the relocation of existing storage facilities to the area adjacent to the E Wing, where portacabins will be installed to accommodate the stores
The Psychology Unit and the relocation of the Psychology Team to a newly obtained portacabin, situated in the external space adjacent to C Wing
The Education Building – Hairdressing Classroom
The purpose of this study is to evaluate the current condition of the facilities, assess the viability of services, and undertake comparative analyses. The study will determine the necessary requirements and identify improvements needed to upgrade the facilities to high, medium, or low specification standards (Reference: Guidance – BASIC DESIGN BRIEF FOR PSPI WORKSHOPS).
Additionally, the study will provide Cost Plans for the required works to ensure an informed approach to implementation
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=959192212
A Wing calorifier and distribution system: replace all required components and replace with new control panel, primary and secondary pumps, Plate heat exchanger and buffer vessel as per the Works Information
B Wing calorifier and distribution system: replace all required components and replace with new control panel, primary and secondary pumps, Plate heat exchanger and buffer vessel as per the Works Information
C Wing calorifier and distribution system: replace all required components and replace with new control panel, primary and secondary pumps, Plate heat exchanger and buffer vessel as per the Works Information
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=973143565
Design, supply, install, and commission a localised extraction system for Workshop 6 within the workshops on Feltham A for removing airborne dust, fumes, and other hazardous materials created during the brick-laying process.
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=977593547
Complete repair of the Print Shop roof. Replace all gullies and repair and clear all down pipes.
in addition scrape back all loose paint on ceiling rafters, rub down and re decorate with 2 coats of suitable paint.
In addition remove damaged section of wall to the rear of building. Rebuild to existing structure.
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=977482814
Contractor to attend site and remove all electrics and water from W-Huts which are called Bunker Bins.
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=977745222