Notification Of Subcontract Package A47 North Tuddenham to Easton Scheme Galliford Try, as one of the East Region Delivery Integration Partners, is delivering the A47 North Tuddenham to Easton project in the County of Norfolk on behalf of National Highways. This project, which is part of major improvements to the existing A47, replaces the existing single carriageways between North Tuddenham and Easton with a dual carriageway, linking the existing dual carriageway at North Tuddenham to the Southern Norwich Bypass at Easton. The route is offline and crosses the existing A47 at three separate locations. Notice to Proceed is expected to be received in October 2023 with Open for Traffic by April 2026. Package: Vehicle Recovery Outline Scope of Works Galliford try is looking for Contractors to provide Provision of vehicle recover in roadworks for the construction of the A47 North Tuddenham to Easton Dual Carriageway. Including, but not limited to, mobilisation, maintenance and demobilisation of recovery bases. Providing a service 24 hours a day with the provision of light and heavy recovery vehicles and recovery impact protection vehicles. Providing the capability to deal with Pothole repairs / spillages, removal of shed loads, debris and dead animals. Recovery operators will be pivotal with regards to incident management with responsibility for dealing with incidents, co-ordinating with the CCTV Control Room - relating information (including vehicle details and contact details where applicable for red and green claims), collaborating with emergency services, traffic safety supervisors & traffic management crews, achieving the required arrival time to incidents under 15 minutes and clearance times of under an hour. Vehicle Recovery will be provided in accordance with Traffic Signs Manual Chapter 8, Traffic Signs Regulations and General Directions, National Highways Raising, the Bar, Manual of Contract Documents for Highways works and sector scheme approval. All interested contractors should hold all the relevant certification, qualifications and experience of providing this type of work. Programme Anticipated Programme information will be provided in the Invitation to Tender documentation sent to the shortlisted Contractors. Timing Deadline for Notifications of Interest 16:00 hrs on 4th August 2023 Galliford Try Procurement Process To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: HE019-A47TUD-EXP@4projectsmail.com , by the above deadline with your notification of interest and details of your capabilities. Any Notifications of interest after above deadline will not receive a response.
Value undisclosed
Notification Of Subcontract Package A47 North Tuddenham to Easton Scheme Galliford Try, as one of the East Region Delivery Integration Partners, is delivering the A47 North Tuddenham to Easton project in the County of Norfolk on behalf of National Highways. This project, which is part of major improvements to the existing A47, replaces the existing single carriageways between North Tuddenham and Easton with a dual carriageway, linking the existing dual carriageway at North Tuddenham to the Southern Norwich Bypass at Easton. The route is offline and crosses the existing A47 at three separate locations. Notice to Proceed is expected to be received in October 2023 with Open for Traffic by April 2026. Package: Temporary CCTV Outline Scope of Works Galliford try is looking for Contractors to provide Provision of temporary CCTV for Roadworks for the construction of the A47 North Tuddenham to Easton Dual Carriageway. Including, but not limited to, installation, maintenance, relocation & removal of temporary CCTV units (columns or standalone units), provision of CCTV Control Room with proactive 24 hours CCTV monitoring. CCTV Staff will provide a central point of co-ordination with regards to incident management with responsibility for contacting the emergency services, dispatching recovery, updating the National Highways Regional Operations Centre, co-ordinating with the Traffic Safety Supervisor and recording of information and production of incident records. The CCTV contractor will be responsible for helping the project achieve an arrival time to incidents under 15 minutes and clearance within an hour. Temporary CCTV is to be provided in accordance with Manual of Contract Documents for Highways works. All interested contractors should hold all the relevant certification, qualifications and experience of providing this type of work. Programme Anticipated Programme information will be provided in the Invitation to Tender documentation sent to the shortlisted Contractors. Timing Deadline for Notifications of Interest 16:00 hrs on 4th August 2023 Galliford Try Procurement Process To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: HE019-A47TUD-EXP@4projectsmail.com , by the above deadline with your notification of interest and details of your capabilities. Any Notifications of interest after above deadline will not receive a response.
Value undisclosed
NOTIFICATION OF SUBCONTRACT PACKAGE A47 Blofield to North Burlingham Dualling Package: Electric works for Compounds Galliford Try, as the East Region Delivery Partner are delivering the A47 Blofield to North Burlingham Dualling project in the county of Norfolk on behalf of National Highways. The project will replace the existing single-lane section of the A47 between Blofield and North Burlingham with a new two-lane dual carriageway 70m South of the existing road length and is 5km in length including safety improvements to the existing junctions. The project total cost is estimated to be in the region of £100million pounds plus. Outline Scope of Works The selected subcontractor is expected to supply and install all the electric cables, sockets, light points to the Blofield scheme compounds. The estimate contract amount for this package is expected to be over £50,000 plus Programme It is anticipated that these works will commence in October 2022. Galliford Try Procurement Process To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: GTA47BLOSupplier.EOI@4projectsmail.com by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
NOTIFICATION OF SUBCONTRACT PACKAGE A47 Blofield to North Burlingham Dualling Package: EV Charging Points Galliford Try, as the East Region Delivery Partner are delivering the A47 Blofield to North Burlingham Dualling project in the county of Norfolk on behalf of National Highways. The project will replace the existing single-lane section of the A47 between Blofield and North Burlingham with a new two-lane dual carriageway 70m South of the existing road length and is 5km in length including safety improvements to the existing junctions. The project total cost is estimated to be in the region of £100million pounds plus. Outline Scope of Works The selected subcontractor is expected to supply and install 10 no. 7KW EV Charging Points The estimate contract amount for this package is expected to be over £10,000 plus Programme It is anticipated that these works will commence in October 2022. Galliford Try Procurement Process To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: GTA47BLOSupplier.EOI@4projectsmail.com by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
A47 / A11 Thickthorn Interchange Galliford Try, as the East Region Delivery Partner are delivering the A47 / A11 Thickthorn Interchange project in the county of Norfolk in partnership with Highways England. The project will help relieve congestion at Thickthorn junction by providing two new free-flowing slip roads that will connect the A47 with the A11. The new slip roads will re-route traffic away from the junction and flow it under new underpasses. The project has recently submitted a Development Consent Order to the Planning Inspectorate and the project is forecast to commence on site in early 2023 and will take around 2 years to complete. Outline Scope of Works Saw Cutting & Drilling - provision of all labour, plant, materials and temporary works as required to provide the subcontract works The estimate contract amount for this package is expected to be within the following range [up to - £500,000] Programme It is anticipated that the subcontract works will commence January 2022 Timings Deadline for Notifications of Interest 16:00 hrs on 20th July 2022 Galliford Try Procurement Process To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted suppliers. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: GTA47TTNSupplier.EOI@4projectsmail.com, by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
A47 / A11 Thickthorn Interchange Galliford Try, as the East Region Delivery Partner are delivering the A47 / A11 Thickthorn Interchange project in the county of Norfolk in partnership with Highways England. The project will help relieve congestion at Thickthorn junction by providing two new free-flowing slip roads that will connect the A47 with the A11. The new slip roads will re-route traffic away from the junction and flow it under new underpasses. The project has recently submitted a Development Consent Order to the Planning Inspectorate and the project is forecast to commence on site in early 2023 and will take around 2 years to complete. Outline Scope of Works Temporary Traffic Management - provision of all labour, plant, materials and temporary works as required to provide the subcontract works The estimate contract amount for this package is expected to be within the following range [£100,000+] The prospective supplier will need to be sector scheme approved. Programme It is anticipated that the Temporary Traffic Management works will commence October 2022. Timings Deadline for Notifications of Interest 16:00 hrs on 20th July 2022 Galliford Try Procurement Process To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted suppliers. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: GTA47TTNSupplier.EOI@4projectsmail.com, by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
A47 / A11 Thickthorn Interchange Galliford Try, as the East Region Delivery Partner are delivering the A47 / A11 Thickthorn Interchange project in the county of Norfolk in partnership with Highways England. The project will help relieve congestion at Thickthorn junction by providing two new free-flowing slip roads that will connect the A47 with the A11. The new slip roads will re-route traffic away from the junction and flow it under new underpasses. The project has recently submitted a Development Consent Order to the Planning Inspectorate and the project is forecast to commence on site in early 2023 and will take around 2 years to complete. Outline Scope of Works Special Ecological Measures - provision of all labour, plant, materials and temporary works as required to provide the subcontract works The estimate contract amount for this package is expected to be within the following range [up to £100,000] Programme It is anticipated that the Special Ecological Measures works will commence during November 2022. Timings Deadline for Notifications of Interest 16:00 hrs on 20th July 2022 Galliford Try Procurement Process To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted suppliers. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: GTA47TTNSupplier.EOI@4projectsmail.com by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
A47 / A11 Thickthorn Interchange Galliford Try, as the East Region Delivery Partner are delivering the A47 / A11 Thickthorn Interchange project in the county of Norfolk in partnership with Highways England. The project will help relieve congestion at Thickthorn junction by providing two new free-flowing slip roads that will connect the A47 with the A11. The new slip roads will re-route traffic away from the junction and flow it under new underpasses. The project has recently submitted a Development Consent Order to the Planning Inspectorate and the project is forecast to commence on site in early 2023 and will take around 2 years to complete. Outline Scope of Works Compound - Provision of all labour and plant as required to provide the subcontract works. The estimate contract amount for this package is expected to be within the following range [£1,000,000 - £1,500,000] Programme It is anticipated that the Compound works will commence early October 2022. Timings Deadline for Notifications of Interest 16:00 hrs on Galliford Try Procurement Process To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted suppliers. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: GTA47TTNSupplier.EOI@4projectsmail.com, by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
A47 / A11 Thickthorn Interchange Galliford Try, as the East Region Delivery Partner are delivering the A47 / A11 Thickthorn Interchange project in the county of Norfolk in partnership with Highways England. The project will help relieve congestion at Thickthorn junction by providing two new free-flowing slip roads that will connect the A47 with the A11. The new slip roads will re-route traffic away from the junction and flow it under new underpasses. The project has recently submitted a Development Consent Order to the Planning Inspectorate and the project is forecast to commence on site in early 2023 and will take around 2 years to complete. Package: Site Clearance - Vegetation & Trees felling Outline Scope of Works Vegetation Site Clearance - Provision of all labour, plant, materials & temporary works as required to provide the subcontract works The estimate contract amount for this package is expected to be within the following range [up to - £500,000] Programme It is anticipated that the works will commence during Early October 2022. Timings Deadline for Notifications of Interest 16:00 hrs on 20th July 2022 Galliford Try Procurement Process To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted suppliers. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: GTA47TTNSupplier.EOI@4projectsmail.com, by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
A47 / A11 Thickthorn Interchange Galliford Try, as the East Region Delivery Partner are delivering the A47 / A11 Thickthorn Interchange project in the county of Norfolk in partnership with Highways England. The project will help relieve congestion at Thickthorn junction by providing two new free-flowing slip roads that will connect the A47 with the A11. The new slip roads will re-route traffic away from the junction and flow it under new underpasses. The project has recently submitted a Development Consent Order to the Planning Inspectorate and the project is forecast to commence on site in early 2023 and will take around 2 years to complete. Outline Scope of Works Acoustic Barriers - Provision of all labour, plant, materials and temporary works as required to provide the subcontract works. The estimate contract amount for this package is expected to be within the following range [up to - £500,000] Programme It is anticipated that the Fencing works will commence during January 2023 Timings Deadline for Notifications of Interest 16:00 hrs on 20th July 2022 Galliford Try Procurement Process To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted suppliers. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: GTA47TTNSupplier.EOI@4projectsmail.com, by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
A47- Wansford to Sutton Scheme Galliford Try, as the East Region Delivery Partner are delivering the A47- Wansford to Sutton Scheme in partnership with Highways England by upgrading from single carriageway to a D2 dual carriageway. The project will help relieve congestion between Wansford and Sutton, approximately along 2.5 km distance, to the west of Peterborough between the existing junction with the A1 and the Nene Way roundabout near Sutton. The project is forecast to commence on site in March 2023 and will take around 2 years to complete. Outline Scope of Works Archaeological Survey Works - provision of all labour, plant, materials and temporary works as required to provide the subcontract works The estimate contract amount for this package is expected to be within the following range [£2 to £3 million] Programme It is anticipated that the subcontract works will commence January 2023. Timings Deadline for Notifications of Interest 16:00 hrs on 26th Oct 2022 Galliford Try Procurement Process To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted suppliers. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address HE012-A47WANCommercial@4projectsmail.com , by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
A47 Blofield to North Burlingham Dualling: Galliford Try are delivering the A47 Blofield to North Burlingham Dualling project in the county of Norfolk on behalf of National Highways. The project will replace the existing single-lane section of the A47 between Blofield and North Burlingham with a new two-lane dual carriageway 70m South of the existing road length and is 5km in length including safety improvements to the existing junctions. Package: REINFORCED SOIL STRUCTURE (INSTALLATION) Outline Scope of Works: Installation of geogrid and fill material for construction of reinforced earth walls. Supply of material to be by GT. Programme: It is anticipated that the above scope of works will commence in April 2025 Timing: Deadline for Notifications of Interest 17:30 hrs on 20th December 2024. Galliford Try Procurement Process: To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: a47procurement@gallifordtry.co.uk by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
A47 Blofield to North Burlingham Dualling: Galliford Try are delivering the A47 Blofield to North Burlingham Dualling project in the county of Norfolk on behalf of National Highways. The project will replace the existing single-lane section of the A47 between Blofield and North Burlingham with a new two-lane dual carriageway 70m South of the existing road length and is 5km in length including safety improvements to the existing junctions. Package: Mastic Joint Sealing Outline Scope of Works: Supply and installation of mastic sealant to bridge joints, minimum of 20 joints at around 17 metres in length. Programme: It is anticipated that the above scope of works will commence in March 2025 Timing: Deadline for Notifications of Interest 17:30 hrs on 16th December 2024. Galliford Try Procurement Process: To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: a47procurement@gallifordtry.co.uk by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
NOTIFICATION OF SUBCONTRACT PACKAGE A47 Blofield to North Burlingham Dualling Package: Supply and Installation of Vehicle Restraint System Galliford Try, as the East Region Delivery Partner are delivering the A47 Blofield to North Burlingham Dualling project in the county of Norfolk on behalf of National Highways. The project will replace the existing single-lane section of the A47 between Blofield and North Burlingham with a new two-lane dual carriageway 70m South of the existing road length and is 5km in length including safety improvements to the existing junctions. Outline Scope of Works: Supply and Installation of the Vehicle Restraint System to include labour and plant, Excavation of foundations, material for foundations and removal off site of surplus spoil to a recycling centre. Programme: It is anticipated that the Vehicle Restraint System Installation will commence on in April 2025. Timing: Deadline for Notifications of Interest 17:30 hrs on 11th December 2024. Galliford Try Procurement Process: To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: a47procurement@gallifordtry.co.uk by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
NOTIFICATION OF SUBCONTRACT PACKAGE A47 North Tuddenham to Easton Scheme: Galliford Try, as one of the East Region Delivery Integration Partners, is delivering the A47 North Tuddenham to Easton project in the County of Norfolk on behalf of National Highways. This project, which is part of major improvements to the existing A47, replaces the existing single carriageways between North Tuddenham and Easton with a dual carriageway, linking the existing dual carriageway at North Tuddenham to the Southern Norwich Bypass at Easton. The route is offline and crosses the existing A47 at three separate locations. Package: Waterproofing for Structures. Outline Scope of Works: Provision of Labour, Equipment and materials for the application of BBA certificated proprietary spray applied waterproofing system to 8No. structures, varying from culverts, underbridges and overbridges. Approximately 4,800 square meters of concrete requires the spray applied waterproofing system. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI). Programme: It is anticipated that the above scope of works will commence in April 2025. Timing: Deadline for Notifications of Interest 17:30 hrs 4th December 2024 Galliford Try Procurement Process: To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: a47procurement@gallifordtry.co.uk by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
NOTIFICATION OF SUBCONTRACT PACKAGE A47 Blofield to North Burlingham Dualling: Galliford Try are delivering the A47 Blofield to North Burlingham Dualling project in the county of Norfolk on behalf of National Highways. The project will replace the existing single-lane section of the A47 between Blofield and North Burlingham with a new two-lane dual carriageway 70m South of the existing road length and is 5km in length including safety improvements to the existing junctions. Package: Bridge Parapets Outline Scope of Works: Provision of all labour, equipment and materials for the installation of N2 steel parapets including all connections on structures S03 and S01, covering approximately 175 linear metres. Detailed specifications will be provided to shortlisted suppliers. Programme: It is anticipated that the above scope of works will commence in January 2025 Timing: Deadline for Notifications of Interest 17:30 hrs on 4th December 2024. Galliford Try Procurement Process: To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: a47procurement@gallifordtry.co.uk by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
NOTIFICATION OF SUBCONTRACT PACKAGE A47 Blofield to North Burlingham Dualling: Galliford Try are delivering the A47 Blofield to North Burlingham Dualling project in the county of Norfolk on behalf of National Highways. The project will replace the existing single-lane section of the A47 between Blofield and North Burlingham with a new two-lane dual carriageway 70m South of the existing road length and is 5km in length including safety improvements to the existing junctions. Package: KERBS, EDGINGS, CDKU'S & TACTILES Outline Scope of Works: The works include but not limited to the supply of labour and plant to install various types of highway kerbs including Splay, Half Battered, bullnose, etc. Programme: It is anticipated that the above scope of works will commence in March 2025 Timing: Deadline for Notifications of Interest 17:30 hrs on 3rd December 2023. Galliford Try Procurement Process: To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: a47procurement@gallifordtry.co.uk by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
NOTIFICATION OF SUBCONTRACT PACKAGE A47 North Tuddenham to Easton Scheme: Galliford Try, as one of the East Region Delivery Integration Partners, is delivering the A47 North Tuddenham to Easton project in the County of Norfolk on behalf of National Highways. This project, which is part of major improvements to the existing A47, replaces the existing single carriageways between North Tuddenham and Easton with a dual carriageway, linking the existing dual carriageway at North Tuddenham to the Southern Norwich Bypass at Easton. The route is offline and crosses the existing A47 at three separate locations. Package: REINFORCED SOIL STRUCTURE (INSTALLATION) Outline Scope of Works: Installation of geogrid and fill material for construction of reinforced earth walls across 4 structures. Supply of material to be by GT. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI). Programme: It is anticipated that the above scope of works will commence in June 2025. Timing: Deadline for Notifications of Interest 17:30 hrs 20th December 2024 Galliford Try Procurement Process: To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: a47procurement@gallifordtry.co.uk by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
NOTIFICATION OF SUBCONTRACT PACKAGE A47 Blofield to North Burlingham Dualling: Galliford Try are delivering the A47 Blofield to North Burlingham Dualling project in the county of Norfolk on behalf of National Highways. The project will replace the existing single-lane section of the A47 between Blofield and North Burlingham with a new two-lane dual carriageway 70m South of the existing road length and is 5km in length including safety improvements to the existing junctions. Package: CCTV (Roadworks) Outline Scope of Works: Provision of temporary CCTV for Roadworks for the construction of the A47 Blofield to North Burlingham Dual Carriageway. Including, but not limited to, installation, maintenance, relocation & removal of temporary CCTV units (columns or standalone units), provision of CCTV Control Room with proactive 24 hours CCTV monitoring. The project will accept proposals of remote cameras rooms, where remote access to the cameras is provided to the site team and national highways. The use of stop vehicle detection is welcome as an aid, not as a replacement for active monitoring by staff. CCTV Staff will provide a central point of co-ordination with regards to incident management with responsibility for contacting the emergency services, dispatching recovery, updating the National Highways Regional Operations Centre, co-ordinating with the Traffic Safety Supervisor and recording of information and production of incident records. The CCTV contractor will be responsible for helping the project achieve an arrival time to incidents under 15 minutes and clearance within an hour. Temporary CCTV is to be provided in accordance with Manual of Contract Documents for Highways works. All interested contractors should hold all the relevant certification, qualifications and experience of providing this type of work. Programme: It is anticipated that the above scope of works will commence in March 2025 Timing: Deadline for Notifications of Interest 17:30 hrs on 4th December 2024. Galliford Try Procurement Process: To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: a47procurement@gallifordtry.co.uk by the above deadline with your notification of interest and details of your capabilities.
Value undisclosed
A47 Blofield to North Burlingham Dualling: Galliford Try are delivering the A47 Blofield to North Burlingham Dualling project in the county of Norfolk on behalf of National Highways. The project will replace the existing single-lane section of the A47 between Blofield and North Burlingham with a new two-lane dual carriageway 70m South of the existing road length and is 5km in length including safety improvements to the existing junctions. Package: WATERPROOFING (BRIDGES) & BRIDGE JOINTS. Outline Scope of Works: Supply and install: -Waterproofing system to horizontal and vertical surfaces -Asphaltic Plug Joints Programme: It is anticipated that the above scope of works will commence in April 2025 Timing: Deadline for Notifications of Interest 17:30 hrs on 3rd December 2024. Galliford Try Procurement Process: To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: a47procurement@gallifordtry.co.uk by the above deadline with your notification of interest and details of your capabilities. Any notifications of interest after the above deadline will not receive a response.
Value undisclosed
Showing 41–60 of 174 contracts