Department for Infrastructure NI has a requirement for the provision of commercial vehicle and specialist body maintenance for the Greater Belfast and North-West areas. A separate contract will be awarded for each of the following lots:
• Lot 1 - Northwest (Northbrook Workshop)
• Lot 2 - Northeast (Ballykeel Workshop)
DfI Transport and Road Asset Management (TRAM)Northern IrelandWAC-510091
This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023.
RAM Surfacing Framework B will include the following work activities: delivery of two or more concurrent resurfacing schemes on a public road; laying various types of asphalt surfacing by mechanical means and by hand, reshaping of carriageways, adjustment of street furniture to new levels, adjustment/provision of kerblines, adjustment/provision of carriageway drainage systems, Temporary Traffic Management, road marking/studs, other associated ancillary works. The Framework will comprise of four area Lots (Works Orders valued above £50k up to £750k) and a Project Lot (projects valued above £750k up to £5m) covering the following areas:
- SFB E2 - Belfast South;
- SFB N2 - Coleraine & Limavady;
- SFB W3 - Dungannon; and
- SFB S2 – Down.
This Framework will deliver works from Call-Off contracts with an overall cumulative value of £150m (ex VAT) over the four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £181.5m (ex VAT).
DfI Transport and Road Asset Management (TRAM)Northern IrelandWAC-515288
This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023.
The Department for Infrastructure – Transport and Road Asset Management (TRAM) intends to establish a multi-contractor, multi-lot framework, for the delivery of Surface Dressing.
The Framework will include the following work activities: application of surface dressing, associated road markings, delivery of temporary traffic management as part of associated civils works on live trafficked public roads, and other associated ancillary works.
The Framework will comprise of seven Area Lots (1-7). A Measured Term Contract (MTC) Call-Off will be awarded for each Area Lot as listed below. Each MTC will deliver surface dressing works commissioned through Works Orders, each with a value of up to £750k.
Area Lots are:
SDF S2 - Newry, Mourne and Down / Ards and North Down;
SDF W2 - Derry and Strabane / Fermanagh and Omagh;
SDF S1 - Armagh, Banbridge and Craigavon;
SDF W1 - Mid Ulster;
SDF N1 - Causeway Coast and Glens;
SDF N2 - Mid and East Antrim / Antrim and Newtownabbey;
SDF E1 - Belfast / Lisburn and Castlereagh.
Framework award is expected to be in April 2026. However, works under the MTC Call-Off Contracts are not anticipated to commence until the 2027 Surface Dressing season, likely to commence in May 2027.
This Framework will deliver works from Call-Off contracts with an overall cumulative value of £80m (ex VAT) over the four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £100m (ex VAT).
DfI Transport and Road Asset Management (TRAM)Northern IrelandWAC-515454
The department have a requirement for the supply and delivery of 3 no. Semi Low loader/Machinery Carrier Trailers up to 44000kg to the following address; Department for Infrastructure TRAM 190A Larne Road Link Ballymena Co. Antrim BT42 3HA
DfI Transport and Road Asset Management (TRAM)Northern IrelandWAC-518838
Permanent Cold-lay Surfacing Material (PCSM)
The requirement has been divided into the following 2 lots:
Lot 1 - PCSM product for use on the network.
Lot 2 - PCSM product for use on the network in wet weather conditions (water activated binder).
DfI Transport and Road Asset Management (TRAM)Northern IrelandWAC-530057
The Department for Infrastructure has a requirement for the supply and delivery of 3 no. 4x4 Wheeled Loaders (with the option to purchase up to a further 4 no. if funding becomes available) Suppliers should refer to the Mandatory Technical Specification Compliance Sheet for full detail on the requirements of this contract.
DfI Transport and Road Asset Management (TRAM)Northern IrelandWAC-533422
This tender notice is for the award of a public contract through an open procedure in
accordance with section 20(1) and (2)(a) of the PA 2023.
RAM Surfacing Framework B will include the following work activities: delivery of two or
more concurrent resurfacing schemes on a public road; laying various types of asphalt
surfacing by mechanical means and by hand, reshaping of carriageways, adjustment of
street furniture to new levels, adjustment/provision of kerblines, adjustment/provision of carriageway drainage systems, Temporary Traffic Management, road marking/studs,
other associated ancillary works. The Framework will comprise of four area Lots (Works
Orders valued above £50k up to £750k) and a Project Lot (projects valued above £750k
up to £5m) covering the following areas:
- SFB E2 - Belfast South;
- SFB N2 - Coleraine & Limavady;
- SFB W3 - Dungannon; and
- SFB S2 - Down.
This Framework will deliver works from Call-Off contracts with an overall cumulative value of £150m (ex VAT) over the four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £180.25m (ex VAT).
DfI Transport and Road Asset Management (TRAM)Northern IrelandWAC-553764