2 matching contracts · Updated daily · Contracts Finder + Find a Tender Service
This enabling works package is required to create safe access onto site and to divert the public to facilitate the future restoration of the canal. In summary this will include a new site entrance, site compound creation, site levelling, construction of a new bridleway bridge, creation and diversion of Public Rights of Way (PROW) and the application of all required permits and permissions. An overview of the works is listed below, which is then expanded on: Planning Conditions and Permits • Provide all necessary for the discharge of three pre-commencement planning conditions • Application for the closure and diversion of PROW • Application for a Coal Authority Permit • Contractor input for a Network Rail Permit • Application for the S278 Works Enabling Works • Security of the site area to protect the public • Forming of a secure compound area and the provision of welfare facilities • Removal of trees and vegetation as identified in advance of the nesting season • Tree protection as identified • Construction of the new S278 highway entrance • Excavation to design formation levels adjacent to the TPT Bridge and lock • Testing of materials as required by the remediation strategy • Stockpiling on site of suitable excavated material • Disposal off site of any materials deemed unsuitable • Design and installation of a suitable and sufficient access road and hardstanding area to facilitate the installation of the TPT Bridge • All required Service diversions and protection, temporary or permanent. • Main Contractor's compound, including any required 278/106/108 works. PROW • Re-routing of PROW through network rail land • Secure fencing to existing PROW which runs across the previously completed canal to the southern extremity of the proposed TPT bridge • Provide a secure and suitable crossing point over the above PROW • Realignment of existing footpaths and construction of new paths to link through to the new TPT Bridge - including management of the PROW's and protection of the public • Installation of new fingerboard signage for pedestrian routes TPT Bridge • Construction of Bridge foundations and piling • Construction of abutment walls • Delivery, assembly and installation of TPT Bridge • Surfacing and drainage to TPT Bridge • Timber parapet to TPT Bridge CDM • Fulfilment of the Principal Contractor role as defined under CDM Regulations 2015. • Fulfilment of the Principal Designer role as defined under CDM Regulations 2015.
Value undisclosed
This Main Works package will restore around 350m of canal and associated works. In summary this will include the construction of canal channel, a lock, vehicle access bridge, the creation of Public Rights of Way (PROW) and the installation of a water supply pumping system. An overview of the works is listed below: Groundworks • Strip existing topsoil and stockpile • Installation of necessary temporary access roads and hardstanding areas to facilitate the proposed construction methodology • Implement agreed temporary protection measures to utilities • Excavation to formation levels • Testing of excavated materials as required by the remediation strategy • Stockpiling on site of suitable excavated material • Disposal off site of any materials deemed unsuitable • Installation of drainage • Placing excavated and imported materials to final profiles, including topsoil • Any other temporary works required to facilitate the proposed construction methodology, including the design of all such temporary works Canal • Construction of 350m of canal channel, including soft and hard edging • Install pumping system for water supply • Canal overflow Bellhouse Lane Bridge • Construction of new vehicular access bridge • Excavation to formation and construction of bridge foundations • Fabrication, delivery, assembly and installation of precast culvert • Formation of earth approach ramps • Road surfacing, vehicle restraint system and drainage to bridge • Surfacing and drainage to footpath approaches Lock • Construct new lock structure, including in-situ concrete, coping stones and brick facing • Manage installation of lock gates (via nominated supplier) Rights of Way • Constructing and / or maintaining temporary rights of way, including farm access • Construction, realignment or upgrade of 2.2km of footpaths • Removal of temporary footpaths and associated reinstatement • Installation only of new fingerboard signage for pedestrian routes Soft and Hard Landscaping Clay Relocation • Movement and placement of clay • Reworking of clay as per Earth Works Spec Report for clay liner CDM • Fulfilment of the Principal Contractor role as defined under CDM Regulations 2015 Site Visits A site familiarisation visit will be held WC 4 November 2024. Mid tender site visits will be held WC 25 November 2024.
£2,900,000
Contract value