The key features of the project are:
• Design all temporary and enabling works
• Design of slope stability system comprising erosion control restraint netting to confirm to the requirements of BS EN 10218-2 & BS EN 10223-3, corrosion protection to be BS EN 10244-2 Class A. Mesh to be BBA certified for a design life of up to 120 years and soil nailing
• Undertake and coordinate design of the proposed systems and installation,
whilst discharging its duty as the appointed Principal Designer (as defined in
the CDM Regs 2015)
• General site clearance
• Removal of vegetation prior to works commencing on site
• Installation of a slope stability system comprising of restraint netting and soil nailing
• Associated soft landscaping works