Loading page content…
Loading page content…
5 matching contracts · Updated daily · Contracts Finder + Find a Tender Service
As part of the planning approval granted to Redrow for development of 220 + houses at the former cement works on Haslingfield Road in Barrington, a S106 agreement has been agreed which will fund the development of a small set of village community facilities. The 106 agreement provides for a degree of flexibility in the way in which the available funds may be allocated to the different facilities. Key amongst these are the Village Hall, and the Sports Pavilion with its associated play areas and car park. The facilities are to be located in their current areas of the village, and the Parish Council now wishes to commission an architect or architects to develop design and feasibility options studies including costed proposals, for either or both facilities. A survey was undertaken in 2021 to determine what, if any, physical / locational constraints will apply in considering options for the provision of the said community facilities. Following that survey a joint meeting of Barrington Parish Council, the Barrington Village Hall Trustee and Sport Group Representatives was held on 21st February 2022. It was agreed that feasibility and design options should be commissioned to upgrade, improve and extend the Village Hall, and to demolish and replace the Sports Pavilion and provide for associated sport facilities. For the avoidance of doubt, the Parish Council has no fixed views on the nature, scale and exact location of the various community facilities. However, as part of its commitment to the whole community the Parish Council in association with the Village Hall Trustee and Sports Clubs has gathered together important "client preferences" information that should be borne in mind when developing proposals. Tenders should indicate whether they relate to all or either of the Community Facilities. They should include a clear method statement, fixed price, and reporting timescales to be sent to the Clerk to Barrington Parish Council by 17.00 hrs. on 30th November 2022 at: parishclerk@barringtonparishcouncil.gov.uk
£120,000
Contract value
Following a detailed options study, Barrington Parish Council now wishes to drive forward with a replacement pavilion and requires an individual or company that can: • Provide the necessary plans to support a planning application. • Post-planning to provide building control plans (if required) • Act as project manager for the construction project • Act as the designated CDM Our commitments mean that we need to replace the pavilion within an overall budget of £400,000. Any designs therefore must be deliverable as a completed building ready for handover within that budget including all fees, materials, site preparation, construction etc. BPC would like you to present your ideas and costs to deliver this project, your fees should be detailed separately to the construction costs within the overall total. For further details see the attached briefing document for outline details of project.
£50,000
Contract value
Following a detailed options study, Barrington Parish Council now wishes to drive forward with a replacement pavilion and requires an individual or company that can: • Provide the necessary plans to support a planning application. • Post-planning to provide building control plans (if required) • Act as project manager for the construction project • Act as the designated CDM Our commitments mean that we need to replace the pavilion within an overall budget of £450,000. Any designs therefore must be deliverable as a completed building ready for handover within that budget including all fees, materials, site preparation, construction etc. BPC would like you to present your ideas and costs to deliver this project, your fees should be detailed separately to the construction costs within the overall total. For further details see the attached briefing document for outline details of project.
£450,000
Contract value
Barrington Parish Council (BPC) wishes to replace or refurbish the village hall. The village hall and the land upon which it sits is held in Trust for the village by the Village Hall Trustee (VHT). The building is in poor condition and s106 funds have been allocated for its refurbishment or replacement. It is not a listed building but is a significant feature and located in a prominent position overlooking the Village Green and within the Conservation Area. It is accessed via a permitted accessway across the Village Green under licence from the Green Charity. Following a detailed options study, BPC now wishes to drive forward with plans for the Village Hall and requires a company that can: • Provide the necessary plans and documentation to support a planning application. • Provide the necessary drawings and documentation to support tenders for construction works. • Post-planning to provide building control plans (if required) • Act as project manager for the construction project • Act as the designated CDM Refurbish The principle of retaining an existing building wherever possible to avoid wasting carbon and resources points to refurbishment as the starting point for Stage 2 Concept Design. However, as the scheme is developed through Stage 2, the size of the original Hall, its proportion, construction and location on the site may limit flexibility in the emerging design and this needs to be considered. The original Hall, with refurbished, insulated roof and new rooflights could sit at the heart of a highly insulated new building that could entirely envelop the old Hall, improving its environmental performance and creating welcoming and service space around it as well as extending its length with a secondary smaller hall to the rear. A Structural Report from the Structural Engineer Price & Myers indicates that the existing timber trusses in the Hall can be refurbished with tie rods at a higher level. Rebuild Alternatively, given the constraints of the Village Hall site, a new building is likely to be laid out with the two Halls at the heart of a building surrounded by circulation and service space. However, the freedom to change the proportion of the main Hall and its relationship to other parts of the building such as the smaller hall, may ultimately allow the design to be more flexible. Accommodation Needs The spatial requirements have been assessed following consultation with users. The total area was fixed at 650sqm in order to compare site layouts but including: - Large hall: a flexible multi-purpose space. - Small hall: a flexible multi-purpose space. - Hospitality: a cafe space served by a kitchen and bar is a new space desired for the Village Hall, locating it at the front of the site enables it to double as a foyer zone for the arrival of large groups to attend performances. It also creates an active and welcoming front for the building, addressing the village green. The cafe area could function as the bar for events. - Meeting Room: this is a new space for smaller meetings doubling as a room for curation or access to the Barrington History Society archive. The store for the archive should be accessible from the room or nearby. Some of the material could be on permanent display in the building. - Community kitchen: if the Cafe is run commercially or has a double function as a bar with a license, it may be necessary to also have a small community kitchen that can be used by community groups including children, such as scouts. Duxford community centre is a precedent for this. - SCDC Guidance on the use of s106 public funds is clear that no space should be for the exclusive use of any single group - thus for example a "sports and social club with bar" as a separate membership and entity would not be allowed. - Early Years: however, Barrington does need pre-school `provision for children up to 5, particularly since the village is expanding with significant numbers of family housing. The size of the Early Years facility was fixed at 120sqm to reflect the level of funding contribution from SCDC, this is sufficient for a simple one room Early Years facility which should be an independent area of the building, with a clear security line between public and pre-school use and a direct entrance from the outside with drop off and pick up arrangements for buggies. This should enable delivery of the DfE's Early Years Foundation Stage (EYFS) statutory framework and would be inspected by Ofsted. The classroom would ideally connect directly to its own outside play space and of course co-location with the village hall would bring potential customers to a Cafe. - Access and Parking requirements will need to be confirmed, and a transport assessment undertaken to provide a baseline count of existing cars at different times of the day and week, to include. - Parking and EV Charging - Disabled parking - Bicycle parking - Refuse and recycling storage Budget Constraints The finite amount of funds available means that the work on the village hall needs to be completed within very strict budgetary constraints. For the provision of architectural, surveying, planning, design and project management services a maximum budget of £160,000 is available. Contract Period The Services tender request includes whole life project management. The intended contract start and end dates - from the design to handover and sign off of the whole project - are Start date 1.9.25 End date 31.8.27.
£160,000
Contract value
Barrington Parish Council (BPC) invites expressions of interest to demolish and replace the prominent and iconic Sports Pavilion on the famous Barrington Village Green. This is a high-profile project using public funds to bring modern facilities to this thriving village community. Following receipt of any contractors' expression of interest, the full plans and associated documents will be released for competitive tender on 1 June or as soon as practicable thereafter
£500,000
Contract value