New road construction at Stanley Hill Cemetery, Amersham, to include:
Excavate existing surface to an average depth of 300mm, removing all soil from site. Area 555 sq metres.
Supply and lay new Terram Geotextile and Type 1 MOT sub base to an average 200mm depth, well consolidating with a heavy roller. Area 555 sq metres.
Supply and lay 60mm of AC 20mm size binder course to EN13108. Area 555 sq metres
Supply and lay 40mm depth of 10mm size surface course to EN13108. Area 555 sq metres
Supply and install circa 370Lm pre cast concrete edging to provide hard retaining edge