To facilitate the construction of the Colne Valley Viaduct, Align JV had to construct a temporary Jetty over the various water courses around the Colne Valley region. This was formed of a tubular piled foundation, steel frame structure, and capped with purpose made precast planks.
The works will consist of the removal of the jetty and finishes (barriers, lamp posts etc.) over water, with the tubular piles cut off below bed level of the various watercourses (piles cannot be removed completely and need to be cut down (probably from within piles)).
All materials removed will either taken back to main compound and disposed of by Align and/or removed from site and disposed of by the selected sub-contractor.
The scope will also include the burning/removal of pile cap sheet pile cofferdams to top of pile cap within the lakes.
The scope will also include the removal of temporary causeway and associated works (fill materials, tensioning bars, sheet piles (cut to ground level) and the like)
Additional information: This will be a highly sensitive operation and in close proximity to the permanent asset, so appropriate consideration will need to be taken for the type of equipment to be used and the methods. A full ITT would be issued to the shortlisted tenderers outlining the constraints.
ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)LondonWAC-403794
This opportunity consists Scaffolding & Access equipment for works at the North Portal (near Great Missenden) - works to include all supervision, labour, plant and materials for the dismantling of the Tunnel Boring Machines (TBM's)
ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)LondonWAC-187058
The below opportunity is for the supply, install and configure of wireless CCTV towers. This will be a mixture of CCTV, PTZ and bullet cameras. Supplier to configure and set up CCTV control room
ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)LondonWAC-122531
Supply and delivery of pre-cleaned and sorted knapped/snapped flint, all from the same quarry.
o Surface area of the wall at Amersham that needs to be faced with flints is 766m2 .
o Gabion baskets require 222m3.
ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)LondonWAC-101373
This opportunity is for the detailed design, manufacture and supply of precast parapets for GMI/2. The proposed structure will be located near South Heath in Buckinghamshire. A new overbridge will provide vehicle and pedestrian access over the proposed route of the HS2 mainline.
Scope;
- 56 No. Precast parapets
ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)LondonWAC-90035
We are inviting qualified and experienced contractors to express their interest in a opportunity for the manufacture, supply, installation, and commissioning of Glass Reinforced Plastic (GRP) Embankment Steps.
This opportunity involves delivering durable, high-quality GRP steps tailored for embankment environments, ensuring long-term performance, safety, and compliance with relevant standards.
Scope of Work Includes:
Design and manufacture of GRP embankment steps
Supply and delivery to site
Full installation on embankment locations
Final commissioning and quality assurance
Interested parties must demonstrate proven experience in GRP fabrication and civil infrastructure installation, along with appropriate certifications and health and safety compliance.
ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)LondonWAC-442049
To provide all labour, management, supervision and equipment to carryout the road construction and surfacing for our GMI/2 and Leather Lane structures, and the PROW construction and surfacing for our GMI/12 structure.
ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)LondonWAC-442542
The scope of works covers the provision of all management, supervision, labour and equipment to carryout the Chalfont St Peter (CSP) temporary access road reinstatement and remaining works, including but not limited to: backfill and reinstatement of temporary infiltration pond, borehole decommissioning, permanent drainage, roadworks, earthworks, landscaping and fencing works.
ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)LondonWAC-482837
The below opportunity is for the manufacturing, supply and installation of Vehicle Restraint System, including design and installation of footing. The Subcontract will also be responsible for the provision of impact tests.
Location
A412 - P54 to P55
VRS Barriers
146m of VRS barrier
4Nr. 4m transitions
4Nr. 12.42m terminals
Subcontractor Requirements
• Provide design for concrete footings
• Provide footing locations to avoid existing services
• Supply and install
• Testing
• Certification
ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)LondonWAC-531621