The Works comprise opening up of construction elements at various locations to enable AECOM to verify and confirm the form of construction at each point, against the designed and as-built information. The contractor will be responsible for making safe and reinstating all opening up works prior to the school re-occupation.
Completed tender submission documents to be returned as per the instructed contained within the Preambles document.
The Works comprise opening up of construction elements at various locations to enable AECOM to verify and confirm the form of construction at each point, against the designed and as-built information. The contractor will be responsible for making safe and reinstating all opening up works prior to the school re-occupation.
Completed Tender Submission Documents to be returned as per instructions within the Preambles Document.
The Works comprise opening up of construction elements at various locations to enable AECOM to verify and confirm the form of construction at each point, against the designed and as-built information. The contractor will be responsible for making safe and reinstating all opening up works prior to the school re-occupation.
Provide completed tender documents as described within Preambles document.