Loading page contentβ¦
Loading page contentβ¦
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | Scottish Hydro Electric Power Distribution plc |
| Main Category: | Goods |
| Procurement Method: | Competitive procedure with negotiation |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 3 July 2024 |
| Application Deadline: | β |
| Procurement ID (OCID): | ocds-h6vhtk-02874c |
| Notice Reference: | 020294-2024 |
All 50 notices for this procurement, oldest first.
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1βUK17 codes.
Substation design often provides large control buildings that are made of metal, and temperature swings are significant which can impact operations. Most substation sites have multiple rooms and areas which contain key Operational Technology (OT) equipment in locations separate from the OT Panel. SSEN Distribution requires environmental monitoring equipment which can produce alerts from substations to the control room, allowing environmental issues to be dealt with before incidents occur which could impact the operational technology and customer supply.
Pipeline status
Not addedContract imported automatically Β· AI writes the response
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation β