Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender update |
| Buyer: | Exeter City Council |
| Main Category: | Goods |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: | Open |
| Estimated Value (ex. VAT): | £6,000,000 |
| Estimated Value (inc. VAT): | £7,200,000 |
| Release Date: | 22 May 2026 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-0544d7 |
| Notice Reference: | 047761-2026 |
All 4 notices for this procurement, oldest first.
PME - Exeter Materials Recycling Facility Plant Installation
PME - Exeter Materials Recycling Facility Plant Installation
Exeter MRF Plant Upgrade
Exeter MRF Plant Upgrade
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Amended link to opportunity advert.
Exeter City Council is seeking to award a Contract for the design, supply and installation of a brand-new Materials Recycling Facility (MRF) processing line at its depot at Exton Road, Marsh Barton, Exeter, EX2 8NR. The new plant is expected to be able to handle 10,500 tonnes per annum (over 1 x 7.5 hour day shift, 5 operational days per week) of co-mingled or source separated mixed dry recyclable Material. The main aims and objectives for the project are to: 1) Promote sustainable waste management practices 2) Provide cost effective recycling facilities to local authorities and others in Exeter and the surrounding areas. The key performance requirements of the plant include (further detail is included within the procurement documents): 1) The recovered recyclable purity rate (by weight) should meet a minimum of 95%. 2) The recovered purity rate (by weight) should meet a minimum of 97%. 3) The maximum contamination rate of recovered products shall be a maximum of 3% contamination by weight. 4) The minimum continuous throughput of the plan in tonnes per hour will be 7 tonnes per hour. 5) The minimum availability of the plant as a percentage of the required operating hours will be 95% of the total running time period of shift operations. The Authority reserves the right to issue updated version (Modification) of the documents to Suppliers as and when the need arises, in order to reflect the corresponding stage of the Competitive Flexible Procedure, together with any changes to the Procurement or any other new information. The contracting authority also reserves the right following contract award, as reflected in Schedule I of the Procurement Act 2023, to make Modifications (unforeseen at this time) as the contract evolved over the full term of the agreement.
Document pack· 1 file
Published contracts in the last 12 months
102
total contracts
£82.7m
total value
£1,426,544
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Estimated Value
£6,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →