Construction of a new laboratory building (Holt 2 Lab), designed and built to operate at Containment Level 3 (CL3) standards

WAC ID:579890
Public SectorActive28 days left
Source:Find a Tender Service (FTS)
Buyer:Forestry Commission
Main Category:Works
Procurement Method:Competitive flexible procedure
Tender Status:Active
Estimated Value (ex. VAT):£16,666,667
Estimated Value (inc. VAT):£20,000,000
Release Date:8 April 2026
Application Deadline:6 May 2026
Enquiry Deadline:28 April 2026
Contract Start Date:4 January 2027 (Estimated)
Contract End Date:31 March 2029 (Estimated)
Contract Duration:2.3 years
Procurement ID (OCID):ocds-h6vhtk-067e4a🔒 BidWriter
Notice Reference:032066-2026🔒 BidWriter

Ready to bid on this contract?

BidWriter AI writes your tender response in minutes — import this contract in one click.

✍️ Start writing this bid →

View Original Notice

Access the full notice on the official portal

🔒 Unlock with BidWriter

Contracting Authority

🔒 Unlock with BidWriter

Organisation

Forestry Commission

620 Bristol Business Park, Bristol, BS16 1EJ

Contact Name:Commercial and Procurement Services
Contact Email:contact@authority.gov.uk
Website:https://procurement.authority.gov.uk
Organisation ID:GB-PPON-XXXX-XXXX

Contact details available on BidWriter

Start free trial →

Submission Details

🔒 Unlock with BidWriter
Tender Submission Deadline:6 May 2026
Enquiry Deadline:28 April 2026
Electronic Submission:Yes

Submission Instructions

https://app.panacea-software.com/ForestryCommission/eRFX-Suppliers/OpenReq.aspx?requirementId=437958a9-fb02-4edf-b218-d06bff93c6e2...

Full submission details available on BidWriter

Start free trial →

Description

SCOPE OF WORKS: Construction of a new laboratory building designed and built to operate at Containment Level 3 (CL3), on a greenfield site within the existing boundary of Forest Research's Alice Holt Research Station in Farnham, Surrey, UK. The new 'Holt 2' research facility will be a purpose-built expansion of existing facilities at Forest Research's Alice Holt Research Station, designed to significantly enhance the UK's capability and capacity to study tree pests and pathogens in controlled environments. The new facility will significantly increase the capacity of the existing Holt 1 containment laboratory. Full specifications will be provided in the Specification Documents once the Invitation to Tender is released. The project overview document is attached to this notice. CONTRACT STRATEGY: Traditional construction works, turnkey contract (Client-supplied detailed design & specification) on a fixed lump sum basis using the NEC4 ECC Main Option A - Priced contract with Activity Schedule. Performance Bond (10%), and Parent Company Guarantees (where applicable). Liquidated damages for delay are anticipated to be set at £700 per day, subject to confirmation in the ITT. DESIGN STRATEGY: At the time of issuing the ITT, detailed design and specification for all elements (RIBA Stage 4) will have been completed (and included in the ITT); the appointed turnkey contractor will take responsibility from, and progress from, the start of RIBA Stage 5 onwards. It is anticipated that the ITT may include an option (or alternative) for the novation of client‑supplied designs to the turnkey contractor. Note that certain proprietary equipment and supply chain requirements will be specified within the ITT where necessary to meet technical and operational requirements of the contract works. The new building is required to achieve a BREEAM Excellent rating, demonstrating a high standard of environmental performance and sustainability. Note: A Planning Application has been submitted for this build. The contract scope includes all works and services required to deliver the laboratory as a fully operational, CL3‑validated containment facility, as outlined above, on a turnkey basis. This includes traditional building construction works—such as foundations, structural steelwork, cladding, building services and landscaping—as well as specialist laboratory and containment facility works. Included with this Notice are the following documents and drawings, which provide further information on the location and the overall laboratory building structure: 1.3434001 A (Location Plan) 2.3434009 (Proposed Block Plan) 3.3434010 D (Proposed Ground Floor Plan) 4.3434011 D (Proposed First Floor Plan) 5.3434012 C (Proposed Roof Plan) 6.3434015 B (Proposed North Elevation) 7.3434016 B (Proposed South Elevation) 8.3434017 A (Proposed East Elevation) 9.3434018 A (Proposed West Elevation) 10.8492PLGA110 (Proposed Site Plan) 11.G28553PERHL2XXDRS06001 P04 12.G28553PERHL2XXDRS06002 P04 13.Holt 2 project overview for tender - rev01

CPV Classifications1 code — click to expand
45214610Construction work

Links & Documents

Apply Online

Proceed to the official portal to submit your bid.

Similar contracts

Prj_5970 - ITT - Purchase of carbon credits as part of the construction of a new HQ for the European Centre of Medium Range Weather Forecasts

Department for Science, Innovation & Technology · WAC-580054

SCAPE Construction Works and Services Framework

Scape Procure Limited (trading as SCAPE) · WAC-580140

Mampitts Community Hub Construction Contract

Shaftesbury Town Council · WAC-580262

Browse all contracts

Pipeline status

Not added
Write this bid in BidWriter

Contract imported automatically · AI writes the response

Sign in to BidWriter to sync favourites across devices

Application Deadline

6 May 2026

28 days left

Estimated Value

£16,666,667

WAC Reference

WAC-579890

Updated daily

View in BidWriter

Need help writing this bid?

Our specialists write winning tender responses. Free consultation, no obligation.

Book a free consultation →