| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | NORTHERN TRAINS LIMITED |
| Main Category: | Services |
| Procurement Method: | — |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: |
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
8 October 2025
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| 1 October 2025 |
| Application Deadline: | 8 October 2025 |
| Contract Start Date: | 19 February 2026 (Estimated) |
| Contract End Date: | 19 July 2026 (Estimated) |
| Contract Duration: | 5 months |
| Procurement ID (OCID): | ocds-h6vhtk-05a5ef |
| Notice Reference: | 061341-2025 |
View Original Notice
Access the full notice on the official portal
Assessments of Newton Heath's current capacity and capabilities show significant constraints that would prevent the planned timetable for new trains being achieved. 5 key issues have been identified and this project is proposed to evaluate the feasibility and define the optimum option to resolve these issues. This lays the foundation for future design and construction projects to be established upon completion of this feasibility and option selection project. In order to identify the optimum solution to address the issues identified at Newton Heath above, a feasibility and option selection project is required. An external supplier will be procured to produce the following deliverables: -Survey strategy and reports from specific surveys. -Risks, issues, assumptions, and dependencies log. -Compliance with safety and design assurance requirements. -Overall feasibility report including constructability assessment and concept design. -Options identification report containing appraisal of possible options. -Single option agreement in principle - define the preferred single option for each scheme and obtain agreement in principle with stakeholders. -Preliminary outline design of the selected single option (ES3) -Design specification of requirements for inclusion in the ITT pack for design stage.
Published contracts in the last 12 months
91
total contracts
£157.6m
total value
£22,512,000
average contract size
Typical categories