Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Buyer: | Eden Geothermal Ltd |
| Main Category: | Services |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £75,000 |
| Release Date: | 16 November 2022 |
| Application Deadline: |
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
28 November 2022
Closed
Estimated Value
£75,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| 28 November 2022 |
| Procurement ID (OCID): | ocds-b5fd17-a1194ead-f99c-4c4c-b268-4ca0ef156b23 |
| Notice Reference: | e7aab5b0-4c80-439c-a804-85a33645fa1c-590784 |
View Original Notice
Access the full notice on the official portal
Provision of full contract lift crane services for the purpose of deploying approximately 3,850 metres of vacuum insulated tubing (VIT) in the deep geothermal well EG-1 at the Eden Project, Cornwall. . The successful contractor will supply fully certified mobile cranes, together with a qualified and certified Crane Operator, Appointed Person and Lift Supervisor and if required a Slinger/Signaller, to undertake planning the lift (including a lift plan), assessing the site conditions, selecting a suitable crane, designating an Appointed Person, supervising the lift, arranging the slinging and signalling and provision of risk assessments and method statements. . The successful contractor will be able to supply: 1: A certified mobile crane, or tower crane, in the range 650 - 800 tonnes, and associated personnel, for this purpose that will primarily include, but not be limited to: --Lifting and running down hole a 3,350 metres of 5½" VIT plus 500 metres of 7" tubing and related components and equipment. --Anticipated period 5 - 7 days 2: A certified mobile crane in the range 50 - 70 tonnes, and associated personnel, for this purpose that will primarily include, but not be limited to: --Suspending tubular running equipment (hydraulic tongs, etc) --Anticipated period of 5 - 7 days 3: A certified mobile crane, in the range 90 - 150 tonnes, and associated personnel, for this purpose that will primarily include, but not be limited to: --Lifting and running a submersible pump, 300 metres of 5" steel tubing, cable and components. --Anticipated period 2 days . There may be a requirement at a later date for the VIT and associated equipment to be removed from the well, but this will be arranged separately if required.
Document pack· 1 file