Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | Brighton & Hove City Council |
| Main Category: | Works |
| Procurement Method: | Restricted procedure |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £11,000,000 |
| Release Date: | 18 January 2023 |
| Application Deadline: | 2 March 2023 |
| Procurement ID (OCID): | ocds-h6vhtk-0392b3 |
| Notice Reference: | 001617-2023 |
All 3 notices for this procurement, oldest first.
Madeira Terraces Restoration - Phase 1
BHCC - Madeira Terraces Restoration Phase 1 - Main Contractor
RS - Madeira Terraces Restoration Phase 1 - Main Contractor
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
Madeira Terrace is a well-known and much-loved Brighton and Hove Landmark. At 865m long in total it is one of the longest cast-iron structures in the world and an admired piece of Victorian architecture, integral to the Eastern Seafront. It is also a significant Grade 2* listed structure within the rich heritage context of the wider coastal city. Phase 1 of the Madeira Terrace Restoration project encompasses 40nr arches sitting between the Royal Crescent steps and the Shelter Hall / Concord 2. The cast iron structure forms a backbone describing the historic development of the seafront. Addressing the sea and the beach firmly braced against the rising East Cliff wall rising behind. It is a 'backdrop': designed and intended to be used and inhabited by the residents of the city for all manner of events and social occasions; for quiet enjoyment, outdoor exercise and for viewing. The structure is now deemed unsafe and public access has not been possible for a number of years, due its condition. The Phase 1 project includes the following elements of works: • Conservation and repair of the historic cast iron structure. • Conservation and management of the historic Japanese Spindle green wall [dating from 1872], and other planting associated with the Green Wall. • Repairs to the facing of the east cliff-wall (a designated highways structure) to ensure public safety; and re-presentation of its surface to visually unify and present a more attractive backdrop to the restored structure. • Public realm landscaping to both the terrace deck above and the promenade walkway below, including new hard surfacing, soft landscaping and street furniture. • Local improvement to Madeira Drive, via new pedestrian crossing points. • New lighting and servicing infrastructure • Repairs and upgrades to the existing lift mechanism within the Shelter Hall / Concorde 2 building, to allow its continued historic function as the original means of step-free access to the terrace. • A new external public lift
Document pack· 1 file
Published contracts in the last 12 months
39
total contracts
£11.2m
total value
£319,399
average contract size
Typical categories
Brighton and Hove Housing Energy Performance Certificates (EPC)
Brighton & Hove City Council · WAC-346851
Supported Living at Brickfields - Market Engagement Activities
Brighton & Hove City Council · WAC-31779
Advocacy Services Market Engagement Event
Brighton & Hove City Council · WAC-62042
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
2 March 2023
Closed
Estimated Value
£11,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →