Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | KBS Maritime Ltd |
| Main Category: | Works |
| Procurement Method: | Restricted procedure |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £1,500,000 |
| Release Date: | 19 February 2025 |
| Application Deadline: | 21 March 2025 |
| Contract Start Date: | 22 March 2025 (Estimated) |
| Contract End Date: | 23 March 2025 (Estimated) |
| Contract Duration: | 0 months |
| Procurement ID (OCID): | ocds-b5fd17-c6b6f41c-e278-4d71-b52c-d89ee4d7243e |
| Notice Reference: | 1e958e69-f3a9-46a6-83e7-dc77db97b745-828199 |
View Original Notice
Access the full notice on the official portal
A full review of all gas safety shut off systems within living accommodation and catering blocks to ensure compliancy and to reduce breakdown tasks where the gas system needs manually resetting, then replacing, as necessary. systems (Solenoid valves, extraction systems, gas detection units, forced ventilation interlocks, ect.) and a full review and replacement of obsolete/broken equipment, and replaced with up to date, compliant safety equipment. The short-to-medium term strategy for the NPC for Level 3 Sub-elements shall be based on a hierarchy of solutions that best reflects the future of the particular buildings concerned, for example. 1. Electric Heat Pumps (high temperature, CO2, heat pumps, cascade etc.) 2. Hybrid Heat Pumps (gas fired and air source) 3. Conventional gas fired boilers The solution for a particular building should be based on the following criteria. 1. Opportunity for a district heat network linked to other buildings 2. Pay-back period (given the potentially short asset lifecycle) 3. Thermal performance of the building and requirement for building fabric improvements e.g. double glazing and insulation 4. The requirement for pipework and emitter upgrades 5. Available footprint for internal/external plant 6. Spare capacity in electrical distribution boards, where applicable 7. Lead-time of equipment and installation/commissioning period 8. All works to be kept in alignment with Net Carbon Zero (NCZ) Strategy
Document pack· 2 files
Published contracts in the last 12 months
9
total contracts
£13.2m
total value
£1,467,778
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
21 March 2025
Closed
Estimated Value
£1,500,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →