Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Pipeline / planning |
| Buyer: | Gentoo Group |
| Main Category: | Works |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Planned |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 6 September 2023 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-b5fd17-78bcd624-861d-479a-a56d-85f01a182f98 |
| Notice Reference: | 6f46b3c8-26aa-480f-9874-2583afb41a4c-677996 |
All 2 notices for this procurement, oldest first.
Heating Upgrade Framework
Heating Upgrade Framework
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Gentoo Group is a Registered Social Landlord that owns and manages approximately 28,000 properties across the boundaries of Sunderland, Houghton, Hetton and Washington - Tyne and Wear. The Group is currently working to ensure that all of its properties meet an EPC standard of "C" or higher by the year 2030. The purpose of this Framework is to procure a number of Contractors to ensure that this target is met by completing varying heating upgrade works within Gentoo properties. The works will include, but may not be necessarily limited to, the following: (a) Installation of combination gas boilers; (b) Installation of system gas boilers; (c) Installation of radiators; (d) Upgrade of existing heating control systems; (e) Cylinder insulation and replacement; and (f) Replacement of full distribution systems. The Framework is due to commence in April 2024 and conclude in March 2026. However, there is the possibility that this Contract may be extended beyond this term, subject to requirements, for an initial period of 1 year and a further extension of 1 year beyond that. Therefore, the maximum duration this Framework can run for will be a period of 4 years. It is still to be confirmed, but at the time of writing Gentoo intend to appoint a maximum of 4 Contractors to this Framework. The Tender is expected to be published in December 2023 with returns expected by February 2024. Award of the Framework will be made in late February/early March 2024, subject to approval Additional information: A pre-market engagement event has been arranged for Monday 6 November to discuss the Framework in more detail. You can register for this event by clicking here: https://events.teams.microsoft.com/event/f225c4ff-240a-4a84-a846-edca47b220c4@40d8f26a-4584-466e-9fee-b7a28c4c7cbc
Published contracts in the last 12 months
15
total contracts
£19.4m
total value
£2,773,810
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →