Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Amendment |
| Buyer: | Three Rivers District Council |
| Main Category: | Services |
| Procurement Method: | Open procedure |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £50,000 |
| Release Date: | 14 December 2023 |
| Application Deadline: | 15 December 2023 |
| Procurement ID (OCID): | ocds-b5fd17-1842f32d-b9f2-42c9-98a7-10a750337c91 |
| Notice Reference: | aa32b2c8-4a0c-4a26-8cba-20a3635bd6b7-707152 |
All 2 notices for this procurement, oldest first.
GB-Rickmansworth: Aquadrome Hydrological Study
GB-Rickmansworth: Aquadrome Hydrological Study
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
NOTE: This notice was updated on 14 December 2023 for the following reason: The date of tender returns has been amended to 26th January at am(Rickmansworth Aquadrome Local Nature Reserve is a 41-hectare Green Flag award winning green space to the south of Rickmansworth town centre, extremely well-used for outdoor recreation, valued by the local community and rich in wildlife. It comprises two lakes, Bury Lake to the west and Batchworth Lake to the east, along with surrounding areas of open grassland and wet woodland. It is bounded to the north and east by the river Colne, to the south by the Grand Union Canal and to the west by Stockers Lake Local Nature Reserve. The large majority of the Aquadrome, with the exception of an area around the café and car park, is in Flood Zone 3. Parts of the site regularly become inaccessible due to flooding during the winter. This project aims to mitigate the impact of flooding on the site where possible and to identify options for access and habitat improvements which can be delivered without increasing local flood risk. The main objectives of the project are to: Identify and assess options to minimise overland flow from Bury Lake into Stockers Lake across a causeway path (Rickmansworth Footpath 65), including the section of Footpath 65 north of the two lakes. Improve understanding of the function of the ditch network and identify and assess options to reduce flood risk on the site through improved ditch maintenance. Conduct a feasibility study and options appraisal for a habitat enhancement scheme on the river Colne through the land owned by Three Rivers District Council as shown on the map, including consideration of bank reinforcement where required. Identify and assess options for a habitat enhancement scheme on Batchworth and Bury Lakes, including consideration of bank reinforcement where required. The primary outcome of the project will be outline designs for the preferred options under each objective.) Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Published contracts in the last 12 months
7
total contracts
£436k
total value
£87,200
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
15 December 2023
Closed
Estimated Value
£50,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →Apply online